Saudi Arabia | Dubai | UAE | Abu Dhabi | Riyadh | Qatar | Dammam | Makkah | Bahrain | Sharjah | Jeddah | Oman
FPSC | PPSC | SPSC | KPPSC | AJKPSC | PPSC | Join Pak Navy | Join Pak Army | PAF | FIA | Police | Rangers
Medical | Bank | Teaching | Engineering | Data Entry | PHP | Latest Posts
SAJID PARVEIZ MALIK
20th Nov1980 to 13th June 2014 Current Promoted AM 30th May 2011 to Dec 2005 Promoted DM 31st Dec to 13th June 2014 AWARDED Jan 1993 Co-Ordination Sub-Engineer ELECTRICAL Responsibilities and achievements: PPM OF BUS – BARS 11KV / 6.6 KV PPM OF MINIMUM OIL, BULK OIL, VACCUM, GAS, SF6 CIRCUIT BREAKERS.REACTORS,MOTORS PPM OF 132 KV TRANSMISSION LINES PPM OF TRANSFORMERS HT CABLE LYING, STRAIGHT THROUGH JOINTS, CABLE END SOLID / OIL TERMINATION MAITINANCE OF STREET LIGHT, TOWER LIGHTS ASSISTANT MANAGER ELECTRICAL: DEPUTY MANAGER ELECTRICAL: Responsibilities and achievements: POWER DESPATCH CENTER SHIFT INCHARGE OPERATION OF POWER DISTRIBUTION NET WORK THE MAIN RESPOSIBILITY PROVIDE11 KV/ 6.6 KV POWER SUPPLY ALL PRODUCTION & SERVICES UNITS OF PLANT THROUGH ITS NET WORK COSISTING OF 24 DISTRIBUTION STATIONS SPREAD ALL OVER THE PLANT OPERATION / MAINTENANCE 132 KV TRANSMISSION LINES 24 DISTRIBUTION STATIONS OPERATION / MAINTINANCE OF 11KV SWITCH GEAR MINIMUM OIL VACCUM, GAS, BULK OIL, SF6 CIRCUIT BREAKERS DIESIL GENERATORS OPERATION REPRATION OF CABLES TUNNELS REPORT AS PER SCHEDULE 132/11/6.6 KV SUPPLY SYSTEM OF MSDS&TPP TRANSMISSION LINES READING OF SINGLE LINES DIGRAM/ CONTROL CIRCUIT DIGRAM DURING 12 HRS ALL REPORTS SUBMITTED TO SE OPERATION & DIRECTOR TECHNICAL PAKISTAN STEEL MILL AWARDED BY DIRECTED ADMINISTRATION PAKISTAN STEELAND PERSONNEL IN RECONGNITION OF OUT STANDINGPERFORMANCE THE RESTORATION OF POWER WHICH BRAKE DOWN AS A FIREINCIDENT IN THE UNDER GROUND HT/LT CABLE TUNNELS 0N 27th JAN 1993. Co-Ordination ENGINEERING LAB RELAY CHECKING & HIGH VOLTAGE M/S KESC TPP / TBS INSTALLATION AT DSS AND IN CABLE TUNNEL TO MAINTAIN THE SYSTEM OF ILLUMINATION DISTRIBUTION STATIONS INCLUDING ITS BASEMENT CO-ORDINATE ALL COSUMERS AT PLANT COMPLEXS 1st July 1986 to 30th May 1989 30th Oct 1984 to 12th June 1986 1st July 1982 to Jan 1984 30th May 1976 to 27th June 1980 MADINA ELECTRICAL CONTRACTORKARACHI (PAKISTAN) ELECTRICAL SUPERVISOR INSTALLATION OF CONSEELD/OPEN WIRINGS OF BUILDINGS INSTALLATION OF ENERGY METERS WINDING OF SINGLE PHASE/3 PASE MOTORS 1HP TO 20 HP WINDING OF TRANSFORMER 25KVA TO 50 KVA Syed Hamid Behbehani (Kuwait) Erection of power distribution sub-station switch gears ELECTRICAL SUPERVISOR ERRECTION OF SUB-STATIONS 11 / 0.44 KV SWITCH GEARS MAINTINANCE OF SUB STATIONS 11 / 0.44 KV SWITCH GEARS HT CABLE INSTALLATION / STRAIGHT THROUGH JOINTS / CABLE END TERMINATION END TERMINATION SOLID &OIL FILLED & LEAKAGE OF TRANSFORMER BUSHES 1000KVA. INSTALLATION OF MULTISTORIES BUILDING CONSEELD/OPEN WIRINGS. AEG TELEFUNKEN LTD Manufacturing of HT / LT Switch Gears TRAINEE / TESTING ENGINEER TESTING OF 11 / 0.44 KV SWITCH GEARS AND ITS AUXILLARIES TESTING OF 11 / 0.44 KV BUS BARS TESTING OF CT, PTS TESTING OF RELAYS ELECTROMECHANICALS WAPDA ( MANGLA ) Sub-Engineer Electrical Operation HYDEL POWER GENERATING STATION 600MWS LOOK AFTER THE OPERATION OF 6 GENERATING UNITS OF 100MW CAPACITY EACH THEIR AUXILLARIES NAMELY HEAVY DUTY AIR COMPERESOR,OIL PUMPS, DEWATERING PUMPS, HYDRAULIC GOVERNOR, AIR BLAST & OIL CIRCUIT BREAKERS& HAVING DEEP KNOWLEDGE OF CO2 FIRE FIGHTING PLANT INSTALLED IN POWER HOUSE. OPERATION OF HEAVY DUTY SIX NO GENERATORS 6X100 MW OPERATION OF TRANSMISSION LINE 132 / 220 KV OPERATION OF 11/ 0.44 KV SWITCH GEARS OPERATION OF POWER TRANSFORMER AND 132/220 KV TRANSMISSION LINES OPERATION OF HEAVY DUTY AIR COMPRESSOR OIL PUMPS DEWATRING PUMPS HYDRAULIC A.F.F. CO2. OPERATION OF SPILL WAY GATE & IN TAKES GATES OF RESERVIOR. COMPUTER SKILL MS OFFICE


Contact SAJID PARVEIZ MALIK
(*) Verified recruiters can download candidate CV/ Resume. Login into your recruiter account for details.